1. We check the ZIP code against the areas we cover, and tell you straight away if we do not.2. We call you, by hand, and usually ask for a photograph of the panel with the cover closed.3. A load calculation, then a site visit if the property needs one.4. A written quote that names every line: circuit, run, panel work, permit, inspection.Not a quote. A quote follows a load calculation, never a phone estimate. Not a booking, nothing is scheduled and no equipment is ordered. Not an entry on a marketing list. The number is used for this job only. Not a call from anybody but us, and never from an autodialer. Level 2 Charge Pro installs Level 2 charging equipment: the dedicated 240-volt circuit, the panel work it depends on, the cable run, and the inspection that closes the job.
Photograph the panel with the cover closed. The main breaker rating is usually printed on it, and it answers our first question. Pace the distance from the panel to where the car actually parks. Check what the load calculation looks at before choosing equipment.